Wind now supplies more of Britain's electricity than any other single source, but not all of what it could produce reaches anyone. When the network cannot carry the power, generators are paid to switch off.

Renewables turned down · Month to date

1 Sep to 22 Sep 2026. 22 days of published settlement data.

2 days are still provisional and may be revised.

Energy thrown away

1,362,713MWh

220% higher than the month before

Enough to run about 184,150,459 homes for a day

Paid to switch off

£53,897,125

£39.55 per MWh not generated

Recovered through network charges on bills

Share of wind wasted

20.5%

Of everything wind could have delivered

Average per day

61,942MWh

About £2,449,869 a day

Which sources were turned down

Wind dominates, but it is not the only renewable that gets curtailed.

Source Curtailed (MWh) Paid Share of curtailment
Wind 1,304,190.2 £51,320,610 95.7%
Hydro 47,384.4 £2,234,339 3.5%
Biomass 11,138.8 £342,176 0.8%

Who was turned down

Energy curtailed by operator over this period. Scottish wind dominates because the network south of the border cannot carry everything it produces.

View as table
Operator Curtailed (MWh) Share of the period
Seagreen Wind Energy Limited 262,484.1 19.3%
Moray Offshore Wind East Ltd 214,985.4 15.8%
Moray Offshore Wind West Ltd 206,838.6 15.2%
Viking Energy Wind Farm LLP 86,819.0 6.4%
SSE Generation Ltd 65,856.9 4.8%
SP Renewables (UK) Limited 58,320.9 4.3%
Neart Na Gaoithe Offshore Wind 46,229.7 3.4%
Stronelairg Windfarm Limited 35,299.3 2.6%
Beatrice Offshore Windfarm Ltd 30,723.4 2.3%
Dorenell Windfarm Limited 29,937.4 2.2%
Statkraft Markets Gmbh 27,629.6 2.0%
North Kyle Wind farm Ltd 26,736.5 2.0%
Limekiln Extension Ltd 22,012.2 1.6%
South Kyle Wind Farm Limited 18,402.3 1.4%
EDF Energy Customers Limited 15,346.4 1.1%
Eneco Energy Trade 14,223.6 1.0%
Marble Power Limited 12,045.2 0.9%
OnPath Energy Limited 11,905.3 0.9%
AIK2A Sustainable Energy Ltd 11,643.8 0.9%
Drax Power Ltd 11,138.8 0.8%
Edgware Energy Limited 9,312.5 0.7%
Strathy Wind Farm Limited 9,184.2 0.7%
Creag Riabhach Wind Farm Ltd 8,895.3 0.7%
Dunmaglass Wind Farm Limited 8,644.1 0.6%
Corriegarth Wind Energy LTD 8,360.9 0.6%
Sandy Knowe Wind Farm Ltd 7,354.2 0.5%
Fallago Rig Wind Farm Limited 7,229.7 0.5%
Smartestenergy Limited 7,166.1 0.5%
Erova Energy Limited 6,918.7 0.5%
Kennoxhead Wind Farm Limited 6,691.9 0.5%
Griffin Wind Farm Ltd 6,619.7 0.5%
Uniper UK Limited 6,335.6 0.5%
Clyde Windfarm (Scotland) Ltd 6,182.5 0.5%
Windy Rig Wind Farm Limited 5,111.8 0.4%
Sonningmay Wind Limited 4,844.3 0.4%
Soundmark Wind Limited 4,293.4 0.3%
Walney Extension Ltd 4,102.3 0.3%
Breesea Limited 3,676.2 0.3%
Evolve Energy Supply Limited 3,335.0 0.2%
Kype Extension Wind Farm Ltd 3,266.7 0.2%
BROCKLOCH RIG WINDFARM LTD 2,885.3 0.2%
Twentyshilling Limited 2,801.9 0.2%
Benbrack Wind Farm Limited 2,608.7 0.2%
Vattenfall Energy Trading 2,247.7 0.2%
RWE Generation UK plc 1,994.4 0.1%
HAGSHAW HILL REPOWERING LTD 1,919.4 0.1%
Aikengall 2 CWCL 1,636.4 0.1%
Kilbraur Wind Energy Ltd 1,288.6 0.1%
ScottishPower Energy Retail 1,270.6 0.1%
Vattenfall Wind Power Ltd 1,158.3 0.1%

How wind is performing right now

Wind output now

10,225MW

Against 28,572 MW of connected capacity

Capacity factor

35.8%

Share of maximum output being delivered

Forecast error

15.6%

859 MW average miss

How far the day-ahead forecast was out

Forecast bias

Cautious

More wind arrived than was forecast

Forecast against outturn

The day-ahead wind forecast and what actually materialised. The forecast runs ahead of the measured line, which stops at the present.

View as table
Half hour Forecast (MW) Actual (MW) Difference
Tue 21:00 2,549 2,019 +530
Tue 22:00 3,077 2,323 +755
Tue 23:00 3,269 2,559 +710
Wed 00:00 3,901 3,121 +780
Wed 01:00 4,327 4,031 +296
Wed 02:00 4,635 4,726 −91
Wed 03:00 5,240 5,288 −48
Wed 04:00 5,390 6,008 −618
Wed 05:00 6,145 8,420 −2,275
Wed 06:00 6,630 8,816 −2,186
Wed 07:00 8,254 8,707 −453
Wed 08:00 8,659 10,225 −1,566
Wed 09:00 9,120 - -
Wed 10:00 9,263 - -
Wed 11:00 9,386 - -
Wed 12:00 9,773 - -
Wed 13:00 9,695 - -
Wed 14:00 9,874 - -
Wed 15:00 10,374 - -
Wed 16:00 10,526 - -
Wed 17:00 10,030 - -
Wed 18:00 9,328 - -
Wed 19:00 8,875 - -
Wed 20:00 8,263 - -
Wed 21:00 7,390 - -
Wed 22:00 6,234 - -
Wed 23:00 5,122 - -
Thu 00:00 4,162 - -
Thu 01:00 3,460 - -
Thu 02:00 2,983 - -
Thu 03:00 2,730 - -
Thu 04:00 2,656 - -
Thu 05:00 2,770 - -
Thu 06:00 3,105 - -
Thu 07:00 3,700 - -
Thu 08:00 4,652 - -
Thu 09:00 5,618 - -
Thu 10:00 6,353 - -
Thu 11:00 7,111 - -
Thu 12:00 7,878 - -
Thu 13:00 8,506 - -
Thu 14:00 9,084 - -
Thu 15:00 9,736 - -
Thu 16:00 10,352 - -
Thu 17:00 10,848 - -
Thu 18:00 11,442 - -
Thu 19:00 12,226 - -
Thu 20:00 13,148 - -
Thu 21:00 14,045 - -
Thu 22:00 14,463 - -
Thu 23:00 14,492 - -
Fri 00:00 14,211 - -
Fri 01:00 13,707 - -
Fri 02:00 12,926 - -
Fri 03:00 12,075 - -
Fri 04:00 11,184 - -
Fri 05:00 10,362 - -
Fri 06:00 9,474 - -
Fri 07:00 8,751 - -
Fri 08:00 8,094 - -
Fri 09:00 7,548 - -
Fri 10:00 7,034 - -
Fri 11:00 6,757 - -
Fri 12:00 6,503 - -
Fri 13:00 6,227 - -
Fri 14:00 6,053 - -
Fri 15:00 5,951 - -
Fri 16:00 5,865 - -
Fri 17:00 5,699 - -
Fri 18:00 5,619 - -
Fri 19:00 6,060 - -
Fri 20:00 6,686 - -
Fri 21:00 7,305 - -
What curtailment is, and why it happens

Britain's windiest places and its biggest demand are at opposite ends of the country. Scotland generates far more wind power than it uses, and the transmission lines running south can only carry so much. When more is produced than the network can move, something has to give.

What gives is the generator. The system operator accepts a bid from it to produce less, and pays it to stop. The energy is not stored or redirected anywhere - it simply never gets produced, and the wind passes through the turbines unused. Gas plants nearer the demand are then paid to make up the shortfall, so consumers pay twice.

This is a network problem rather than a wind problem. New transmission links and grid-scale storage are being built to relieve it, but they take years, while wind capacity has grown quickly. Curtailment is the visible cost of that mismatch.

Forecast error matters for a related reason. Wind being variable is manageable; wind being unpredictable is expensive, because the system operator has to hold other plant in reserve to cover whatever the forecast gets wrong. A smaller error means less standby generation burning fuel for nothing.

Why solar is not shown here

Solar curtailment cannot be reported from this data, and it would be misleading to show a zero. Almost all of Britain's solar is connected to local distribution networks rather than the transmission system, so it never enters the Balancing Mechanism - the market through which generators are instructed and paid to change output.

There is no solar fuel type in the Balancing Mechanism unit register at all. A handful of very large solar farms are registered under a general category, but they are a small fraction of installed solar and are not identifiable as solar with any confidence.

Wind, hydro and biomass are all shown above, because those do appear in the register and are all curtailed in practice. Solar is the one renewable this data cannot speak to.

Updated at 09:02. This page keeps itself current.